Skip to main content

NASA’s mighty moon rocket completes its gentlest mission ever

NASA Barge Crew Describes What It’s Like to Transport Moon Rocket

For such a powerful piece of machinery, it’s incongruous to see NASA’s SLS moon rocket taking a leisurely barge trip.

The space agency used the enormous Pegasus barge to transport its 212-foot-tall (64.6 meters), 27.6-foot-diameter (8.4 meters) core stage booster from the agency’s Stennis Space Center near Bay St. Louis, Mississippi, where it underwent testing, to Kennedy Space Center in Florida for Artemis I launch preparations.

Relying on barge power instead of its awesome RS-25 engines, the SLS rocket traveled 900 miles along both inland and ocean waterways aboard the 310-foot-long (94.5 meters) vessel, with a experienced crew from Center Operations at NASA’s Marshall Space Flight Center in Huntsville, Alabama, overseeing the delicate operation.

A video (top) posted this week shows the rocket on its way to Kennedy Space Center, and includes the Pegasus crew talking about their work.

NASA has always used barges to move large spaceflight hardware from testing and manufacturing facilities to launch sites at Kennedy. Due to the SLS rocket’s large size — it’s the longest item ever shipped by a NASA barge — the space agency had to carry out design changes to Pegasus.

pegasus rocket transporter
Image used with permission by copyright holder

“Pegasus was specially designed and built in 1999 to transport the giant external tanks of the space shuttles from the Louisiana shore to NASA’s Kennedy Space Center on the eastern coast of Florida,” NASA says on its website, adding that the vessel “replaced Poseidon and Orion, barges that were used to carry Saturn rocket stages and hardware for the Apollo Program. Pegasus completed its final space shuttle-related voyage in 2011.”

Now that it has reached its destination, the core stage will soon join the two solid rocket boosters inside a facility where it will be assembled to create the final SLS launch vehicle.

The SLS core stage recently completed successful test fires to ensure the integrity and operation of the moon-bound rocket. NASA is now focused on its highly anticipated Artemis I mission, set to take place in the fall. The crewless mission will involve the SLS rocket launching the Orion capsule to space, where it will undertake a fly-by of the moon before returning to Earth. If that goes to plan, the Artemis II mission will launch a crew of four astronauts on a fly-by of the moon, with Artemis III attempting a crewed lunar landing before the end of this decade.

Editors' Recommendations

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA calls off second try at moon rocket launchpad test
NASA's SLS rocket on the launchpad.

NASA has called off a second attempt at a launchpad test of its next-generation rocket destined for lunar missions as part of the Artemis program.

The so-called “wet dress rehearsal” would have involved NASA filling its powerful Space Launch System (SLS) with fuel before conducting a mock countdown.

Read more
NASA’s test of its massive moon rocket is underway today
Space Launch System ready for wet dress rehearsal, a sunrise in the background.

NASA is conducting one of the last major tests of its new Space Launch System rocket and Orion spacecraft before its first uncrewed mission to the moon, tentatively scheduled for later this year. Known as the wet dress rehearsal, the test involves rolling the rocket out to Launch Pad 39B at NASA’s Kennedy Space Center in Florida and filling it with fuel and performing a countdown, but not actually launching it.

The test runs over the weekend, lasting for two days as the team performs the same preparation sequence that would be used for a real launch. With the rocket on the pad, the teams will power on various systems of both the rocket and the Orion spacecraft it carries, before loading the rocket with over 700,000 gallons of super-cold liquid fuel -- hence the name "wet" dress. Once the rocket is filled with fuel, the team will perform a countdown to launch, check whether the countdown clock can be recycled if necessary, and then drain the fuel out of the tanks. The test involves coordinating personnel across the Launch Control Center at Kennedy, the Mission Control Center at NASA’s Johnson Space Center in Houston, the Space Force Eastern Range, and the SLS Engineering Support Center at the Marshall Space Flight Center in Huntsville, Alabama.

Read more
NASA delays launch of its first tourism mission to ISS
A SpaceX Falcon 9 rocket launching from Cape Canaveral.

NASA has delayed the launch of its first space tourism mission to the International Space Station (ISS).

The Ax-1 mission, organized by Texas-based Axiom Space, was supposed to launch from the Kennedy Space Center in Florida on Sunday, April 3, but the date has been shifted to Wednesday, April 6.

Read more