Skip to main content

NASA eyes three dates for mega moon rocket’s maiden launch

NASA has taken a major step toward the highly anticipated maiden launch of its mega moon rocket.

The space agency this week named three dates in late August and early September that currently offer ideal conditions for the launch of its mighty Space Launch System (SLS) rocket and Orion spacecraft as part of the Artemis I mission.

At a briefing on July 20, NASA officials cited August 29, September 2, and September 5 as possible launch dates for the mission, which will involve the Orion spacecraft performing a flyby of the moon before returning to Earth. The selected launch date is likely to be confirmed about a week prior to liftoff.

The mission duration will vary depending on the date, NASA said. So if the SLS launches on August 29 or September 5, the mission will last 42 days, while a September 2 launch will see Orion return 39 days later.

Following the completion of a recent ground-based test involving the SLS rocket, technicians are now making final adjustments to the vehicle in preparation for launch from the Kennedy Space Center in Florida.

Artemis I will be an uncrewed flight to test both the SLS rocket and Orion spacecraft, while Artemis II will take the same path but with a crew on board. Artemis III, which could take place as early as 2025, will aim to put the first woman and first person of color on the surface of the moon in what would be the first astronaut lunar landing in five decades.

NASA’s Artemis program heralds a new era of human space exploration, and involves plans for a long-term lunar presence that could serve as a stepping stone for the first crewed missions to Mars.

The SLS will be one of the most powerful rockets ever to launch, capable of delivering 8.8 million pounds of thrust, 15% more than the 7.5 million pounds offered by the Saturn V, which powered the first astronauts toward the moon in the Apollo missions 50 years ago.

For an idea of the kind of power that will be on display during the SLS’s first launch, take a look at this NASA video showing a ground-based test that involved firing all four of the rocket’s engines at the same time, as if for an actual launch.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA eyes levitating robot train for the moon
Artist concept of novel approach proposed by a 2024 NIAC Phase II awardee for possible future missions depicting lunar surface with planet Earth on the horizon.

An artist's concept of novel approach proposed by a 2024 NIAC Phase II awardee for possible future missions depicting lunar surface with planet Earth on the horizon. NASA/Ethan Schaler

NASA is exploring the idea of building a railway on the lunar surface that uses levitating robots to provide “reliable, autonomous, and efficient payload transport on the moon.”

Read more
NASA reveals new target date for first crewed Starliner launch
ULA's Atlas V rocket and Boeing Space's Starliner spacecraft on the launchpad at the Kennedy Space Center in Florida.

ULA's Atlas V rocket and Boeing Space's Starliner spacecraft on the launchpad at the Kennedy Space Center in Florida. NASA/ Joel Kowsky

NASA has announced a new target date for the first crewed flight of Boeing Space’s Starliner spaceraft.

Read more
NASA’s Orion spacecraft has ‘critical issues’ with its heat shield, report finds
The Orion crew module for NASA’s Artemis II mission.

The Orion crew module for NASA’s Artemis II mission. NASA/Kim Shiflett

NASA is intending to use its new Orion capsule to send astronauts to the moon under its Artemis program, but a new report finds that issues with the capsule's heat shield could be a risk to crew safety. The report from NASA's inspector general was released this week and details issues with the heat shield, which lost some material during the first flight of Orion during the Artemis I mission in 2022.

Read more