Skip to main content

How to watch the rollout ahead of NASA’s biggest launch of the year

UPDATE: NASA had planned to start the rollout on Thursday but is now aiming to begin the process two days earlier, on Tuesday evening ET. This article has been updated to reflect this change.

Artemis I - Roll to the Pad

NASA is gearing up for its biggest launch of the year: The Artemis I mission, which will send an uncrewed spacecraft into orbit around the moon and return it back to Earth ahead of future missions to bring astronauts back to the moon. Before any astronauts blast off, however, NASA needs to test its new rocket (the Space Launch System) and new capsule (Orion) to ensure that they are safe and ready to carry people.

Artemis I will launch from Launch Complex 39B (LC-39B) at the Kennedy Space Center and make a flyby of the moon, collecting scientific data as well as testing out the new technology. The launch window for the mission is set to open on August 29, and the agency will be livestreaming the whole launch event. But the preparations for the launch are already beginning this week, with the enormous 320-foot-tall Space Launch System rocket being rolled out to the launch pad on the evening of Tuesday, August 16.

A full Moon in view on June 14, 2022 behind the Space Launch System and Orion spacecraft atop the mobile launcher at Launch Complex 39B at NASA’s Kennedy Space Center in Florida.
A full Moon in view on June 14, 2022, behind the Space Launch System and Orion spacecraft atop the mobile launcher at Launch Complex 39B at NASA’s Kennedy Space Center in Florida. The rocket and spacecraft are undergoing final preparations for launch. NASA/Ben Smegelsky

To watch the stately progress of the rocket as it is carried by a special crawler on the four-mile journey to the launch pad, fire up the video player at the top of this page or head to NASA’s Kennedy Space Center’s YouTube channel, where a livestream will show the progress of the rocket beginning at 9 p.m. ET (6 p.m. PT) on Tuesday, August 16.

NASA is also working on final preparations for the launch, with the rocket currently located in the Vehicle Assembly Building at Kennedy. This includes testing the system which can terminate the launch in the case of an emergency, called the flight termination system test. Once this is complete, the access platforms which allow crew access to the rocket will be retracted and the rollout can begin.

Editors' Recommendations

Georgina Torbet
Georgina is the Digital Trends space writer, covering human space exploration, planetary science, and cosmology. She…
Watch how NASA plans to land a car-sized drone on Titan
An artist's impression of NASA's Dragonfly drone.

 

A decision by NASA this week paved the way for the Dragonfly drone mission to continue to completion.

Read more
Watch NASA begin testing its Orion capsule for lunar flyby
NASA starts testing the Orion capsule for the Artemis II mission.

NASA has started testing the Orion spacecraft that will take four astronauts on a voyage around the moon as part of the Artemis II mission currently scheduled for 2025.

The space agency shared a video (below) showing the Orion capsule being transported to an upgraded vacuum chamber inside the Operations and Checkout Building at NASA’s Kennedy Space Center in Florida. There, it will undergo electromagnetic compatibility and interference testing.

Read more
NASA astronauts will try to grow plants on the moon
An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface.

An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface. NASA

It was almost a decade ago when astronauts aboard the International Space Station sat down for a meal of historical significance as it was the first to include food -- albeit only lettuce -- grown and harvested in space.

Read more