Skip to main content

NASA calls off second try at moon rocket launchpad test

NASA has called off a second attempt at a launchpad test of its next-generation rocket destined for lunar missions as part of the Artemis program.

The so-called “wet dress rehearsal” would have involved NASA filling its powerful Space Launch System (SLS) with fuel before conducting a mock countdown.

But engineers brought a halt to proceedings at Launch Complex 39B at the Kennedy Space Center in Florida late afternoon on Monday after they noticed a stuck valve on ground equipment linked to the test.

“During chilldown of the lines in preparation for loading the liquid hydrogen, the teams encountered an issue with a panel on the mobile launcher that controls the core stage vent valve,” NASA explained in a post on its website. “The purpose of the vent valve is to relieve pressure from the core stage during tanking. Given the time to resolve the issue as teams were nearing the end of their shifts, the launch director made the call to stop the test for the day.”

The space agency said a team will further investigate the issue before deciding on a new schedule for the test.

Despite the setback, the team said in a tweet that “a lot of great learning and progress” had been achieved during Monday’s efforts.

The first attempt at conducting the wet dress rehearsal took place on Sunday, April 3 but was called off after an issue was discovered with the rocket’s mobile launcher.

NASA's SLS rocket on the launchpad.
NASA’s SLS rocket and Orion spacecraft on the launchpad at the Kennedy Space Center in Florida on Monday, April 4. Image used with permission by copyright holder

The important rehearsal is the last major test before the uncrewed Artemis I launch, which up until recently, had been tentatively scheduled for next month. It’s not clear if the latest issues will affect that proposed date.

The Artemis I test flight will see the SLS rocket power the new Orion spacecraft to orbit. Orion will then perform a fly-around of the moon before returning to Earth. If all goes to plan, Artemis II will fly the same path, but this time with a crew on board, while Artemis III, set for no earlier than 2024, will put the first woman and first person of color on the lunar surface in the first crewed touchdown since 1972.

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA delays first crewed Artemis missions to the moon
An illustration showing astronauts on the moon.

NASA has delayed its plan to send four astronauts on a flyby of the moon in the Artemis II mission in November, announcing that it will now take place no earlier than September 2025.

In the same announcement made on Tuesday, NASA chief Bill Nelson said that the first crewed landing, originally planned for 2025 as part of Artemis III, will now launch in September 2026 at the earliest.

Read more
Five rocket launches to look out for in 2024
SpaceX's Starship rocket lifting off in November 2023.

This year promises a bunch of launches featuring new rockets from a range of operators. Let's take a look at five notable rocket launches that are sure to make headlines over the coming months:
ULA’s Vulcan Centaur

The first of these takes place on Monday, January 8, with United Launch Alliance conducting the maiden launch of its brand-new Vulcan Centaur rocket. The 202-feet-tall (61.6-meter) vehicle will launch from the Kennedy Space Center in Florida on a mission to become the first to land a privately built lander on the moon.

Read more
NASA tests moon elevator for Artemis III mission
Two NASA astronauts test an elevator for the Artemis III lunar mission.

NASA’s highly anticipated Artemis III mission will see the first woman and first person of color step onto the lunar service in a moment that will also mark the first human lunar landing since 1972.

If the space agency sticks to its schedule, the mission will take place in 2025, but there’s still much work to be done to ensure that that happens.

Read more