Skip to main content

NASA’s next-generation rocket returns to assembly building today

Following a successful test of its fueling capabilities last month, NASA’s next-generation rocket, the Space Launch System, will return to its home at the Vehicle Assembly Building at the Kennedy Space Center in Florida today. The rocket, intended to eventually carry astronauts back to the moon under the Artemis program, could launch for the first time on the uncrewed Artemis I mission in late August or early September.

Artemis I Wet Dress Rehearsal

For the fueling test, called the wet dress rehearsal, the rocket was wheeled out of the Vehicle Assembly Building or VAB and onto Launch pad 39B where it has stayed for the past few weeks. Now, the rocket will head back inside for final adjustments. But moving the 212-foot-tall rocket across the four miles from the launch pad to the building isn’t a simple task, it requires the use of a massive crawler and takes several hours.

Returning the rocket to the building had originally been scheduled for yesterday, Friday, July 1, but was pushed back by one day due to the path along which the crawler travels, called the crawlerway, being uneven. “The inclined pathway must be precisely level with an even distribution of the rocks that make up the crawlerway in order to support the load of the mobile launcher and rocket that it will carry,” NASA explained, so teams spent yesterday leveling out the slope so it could be used by the crawler.

NASA announced that the rocket and crawler left the launch pad at 4:12 a.m. ET this morning, Saturday, July 2, and that it was scheduled to arrive at the building later this morning. You can watch the rocket’s progress either using the video embedded above or by heading to the Kennedy Space Center newsroom YouTube channel.

“Once inside the VAB, teams will replace a seal on the quick disconnect of the tail service mast umbilical to address a liquid hydrogen leak detected during the wet dress rehearsal, along with planned forward work as the Space Launch System and Orion spacecraft are readied for launch,” NASA wrote.

Following the wet dress rehearsal, the hope was that the rocket could launch on its first mission as early as August. This goal was confirmed to Ars Technica this week, with NASA’s senior exploration official Jim Free telling Ars that they are working toward a launch window of August 23 to September 6 for the Artemis I launch.

Editors' Recommendations

Georgina Torbet
Georgina is the Digital Trends space writer, covering human space exploration, planetary science, and cosmology. She…
NASA needs a new approach for its challenging Mars Sample Return mission
An illustration of NASA's Sample Return Lander shows it tossing a rocket in the air like a toy from the surface of Mars.

NASA has shared an update on its beleaguered Mars Sample Return mission, admitting that its previous plan was too ambitious and announcing that it will now be looking for new ideas to make the mission happen. The idea is to send a mission to collect samples from the surface of Mars and return them to Earth for study. It's been a long-term goal of planetary science researchers, but one that is proving costly and difficult to put into practice.

The Perseverance rover has already collected and sealed a number of samples of Mars rock as it journeys around the Jezero Crater, and has left these samples in a sample cache ready to be collected.  However, getting them back to Earth in the previous plan required sending a vehicle to Mars, getting it to land on the surface, sending out another rover to collect the samples and bring them back, launching a rocket from the planet's surface (something which has never been done before), and then having this rocket rendezvous with another spacecraft to carry them back to Earth. That level of complexity was just too much to be feasible within a reasonable budget, NASA Administrator Bill Nelson announced this week.

Read more
Junk from the ISS fell on a house in the U.S., NASA confirms
The International Space Station.

A regular stanchion (left) and the one recovered from the NASA flight support equipment used to mount International Space Station batteries on a cargo pallet. The recovered stanchion survived reentry through Earth’s atmosphere on March 8, 2024, and impacted a home in Florida. NASA

When Alejandro Otero’s son called him on March 8 to say that something had crashed through the roof of their home, he initially thought it might have been a meteorite.

Read more
These 3 companies are developing NASA’s new moon vehicle
An artist’s concept design of NASA’s Lunar Terrain Vehicle.

NASA has big plans for the moon -- not only sending people back to the moon for the first time in over 50 years but also having them investigate the exciting south pole region, where water is thought to be available. The plan is not just for astronauts to visit for a day or two, but to have them stay on the moon for weeks at a time, exploring the surrounding area. And to explore, they can't just travel on foot -- they'll need a new moon buggy.

Today, Wednesday, April 3, NASA announced the three companies developing its new lunar vehicle: Intuitive Machines, Lunar Outpost, and Venturi Astrolab. They'll each develop a lunar terrain vehicle (LTV) that can carry astronauts from their landing site across the moon's surface, allowing them to range further and reach more areas of interest.

Read more