Skip to main content

NASA’s mega moon rocket arrives at launchpad (again)

NASA’s next-generation SLS rocket and Orion spacecraft have arrived on the launchpad at the Kennedy Space Center ahead of a second attempt at a key preflight test.

NASA’s Space Launch System (SLS) rocket and Orion spacecraft arrived at Kennedy’s launch complex 39B following a four-mile, eight-hour journey from the facility’s Vehicle Assembly Building.

Carried by one of NASA’s low-slung crawler vehicles that moves at no faster than 1 mph, the SLS and Orion vehicles reached the launchpad at about 8:20 a.m. ET on Monday, June 6.

The space agency shared several images of the 332-feet (98.1-meter) rocket in position:

https://twitter.com/NASA_SLS/status/1533908228601438212

In preparation for the Artemis I lunar mission, the SLS rocket will undergo a so-called “wet dress rehearsal” no earlier than June 19. This important pre-launch procedure involves filling the rocket’s tanks with fuel and performing a mock countdown.

Prior to the rehearsal, NASA engineers will spend some time securing the SLS rocket and mobile launcher to ground support equipment.

This is the second time for the SLS rocket and Orion spacecraft to be transported to the launchpad for a wet dress rehearsal. But after reaching the launchpad in March, a rehearsal in early April was called off after engineers identified a number of technical issues.

As a result, the vehicle was rolled back to the Vehicle Assembly Building so the issues could be addressed.

Once the SLS rocket achieves a successful wet dress rehearsal, the vehicle will be deemed ready for its first mission, Artemis I.

The uncrewed test mission will use the SLS to power the Orion toward the moon. The spacecraft will perform a flyby of our nearest neighbor before returning to Earth.

A successful flight will pave the way for Artemis II, which will take the same path but this time with astronauts aboard the Orion.

If NASA is fully satisfied with the performance of both the SLS and the Orion, Artemis III will land the first woman and first person of color on the lunar surface in what will be the first crewed lunar landings since the final Apollo mission in 1972. Artemis III is currently scheduled for no earlier than 2025.

The Artemis program is seeking to launch a new era in lunar exploration with a view to establishing the first long-term presence on the moon. NASA said that it aims to “use what we learn on and around the moon to take the next giant leap: Sending the first astronauts to Mars.”

Trevor Mogg
Contributing Editor
Not so many moons ago, Trevor moved from one tea-loving island nation that drives on the left (Britain) to another (Japan)…
NASA astronauts will try to grow plants on the moon
An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface.

An artist’s concept of an Artemis astronaut deploying an instrument on the lunar surface. NASA

It was almost a decade ago when astronauts aboard the International Space Station sat down for a meal of historical significance as it was the first to include food -- albeit only lettuce -- grown and harvested in space.

Read more
NASA, Boeing delay Starliner’s first crewed flight again
Boeing’s CST-100 Starliner spacecraft.

Boeing’s CST-100 Starliner spacecraft. Boeing / Boeing

The first crewed test flight of Boeing Space’s CST-100 Starliner spacecraft has been delayed yet again, but this time it’s not the result of an issue with the vehicle itself.

Read more
Meet NASA’s trio of mini moon rovers set to launch next year
Part of NASA’s CADRE technology demonstration, three small rovers that will explore the Moon together show off their ability to drive as a team autonomously – without explicit commands from engineers – during a test in a clean room at the agency’s Jet Propulsion Laboratory in December 2023.

NASA is ramping up its plans for exploring the moon, not only in terms of preparing to send astronauts there but also rovers. There's the VIPER rover, which will search for water around the lunar south pole, and now NASA is introducing a trio of mini rovers called CADRE, or Cooperative Autonomous Distributed Robotic Exploration. These will work together as a team to map the lunar surface, testing the possibilities of using rovers in groups for future exploration.

The rovers, developed at NASA's Jet Propulsion Laboratory, are just the size of a carry-on suitcase. They are designed to move independently but share data so they can cover more ground than a single rover could. They'll have to work over a lunar day, which is about two weeks, to map out features on the surface and look below ground using radar.

Read more